Logo

Basic Maths MCQs

Option A: 31000

Option B: 41250

Option C: 31250

Option D: None of These

Correct Answer: 31250


Click for More Details

Option A: 7

Option B: 9

Option C: 12

Option D: 8

Correct Answer: 9


Click for More Details

Option A: 5

Option B: 6

Option C: 7

Option D: 12

Correct Answer: 7


Click for More Details

Option A: 16 Hours

Option B: 16.5 Hours

Option C: 17 Hours

Option D: 15.5 Hours

Correct Answer: 16.5 Hours


Click for More Details

A.  12,16
B.  18,10
C.  15,13
D.  14,12

Submitted by: Aamir Babar

Explain:
12,16

10 + 10 = 20
2 + 6 = 8
Difference 4 hai
1 10
2 10
3 2
4 8

Pakistan Airforce Intelligence Test Mcqs

Correct Answer: A.  12,16


Click for More Details

Option A: 45434 square foot

Option B: 34343 square foot

Option C: 43572 square foot

Option D: 43560 square foot 

Correct Answer: 43560 square foot 


Click for More Details

Option A: 4970

Option B: 4950

Option C: 4900

Option D: 4980

Correct Answer: 4970


Click for More Details

Option A: 4900

Option B: 4970

Option C: 4960

Option D: None of these

Correct Answer: 4900


Click for More Details

Option A: 150

Option B: 140

Option C: 130

Option D: 110

Correct Answer: 150


Click for More Details

Option A: 150

Option B: 140

Option C: 130

Option D: 160

Correct Answer: 160


Click for More Details

Option A: 300

Option B: 200

Option C: 400

Option D: 500

Correct Answer: 300


Click for More Details

Option A: 0.03375

Option B: 0.3375

Option C: 3.375

Option D: 33.75

Correct Answer: 0.03375


Click for More Details

Option A: 600

Option B: 700

Option C: 800

Option D: 900

Correct Answer: 800


Click for More Details

Option A: 4

Option B: 6

Option C: 9

Option D: 12

Correct Answer: 12


Click for More Details

Option A: 18

Option B: 13

Option C: 15

Option D: 20

Correct Answer: 18


Click for More Details

Option A: 1400

Option B: 1300

Option C: 1200

Option D: 1100

Correct Answer: 1200


Click for More Details

Option A: 16%

Option B: 16 1/3 %

Option C: 16 2/3 %

Option D: 16 3/5 %

Correct Answer: 16 2/3 %


Click for More Details

Option A: 25%

Option B: 50%

Option C: 75%

Option D: 33%

Correct Answer: 75%


Click for More Details

Option A: 19

Option B: 20

Option C: 21

Option D: 22

Correct Answer: 21


Click for More Details

A. 12
B. 15
C. 22
D. 20

Work done by P in 1 day = 1/15
Work done by Q in 1 day = 1/10
Work done by P and Q in 1 day = 1/15 + 1/10 = 1/6
Work done by P and Q in 2 days = 2 × (1/6) = 1/3
Remaining work = 1 – 1/3 = 2/3
Time taken by P to complete the remaining work 2/3 = (2/3) / (1/15) = 10 days
Total time taken = 2 + 10 = 12 days

Correct Answer: A. 12


Click for More Details

A. 70
B. 50
C. 40
D. 60

Amount of work done by A and B in 1 day = 1/30

Amount of work done by A and B in 20 days = 20 × (1/30) = 20/30 = 2/3

Remaining work – 1 – 2/3 = 1/3

A completes 1/3 work in 20 days

Amount of work A can do in 1 day = (1/3)/20 = 1/60

=> A can complete the work in 60 days

Correct Answer: D. 60


Click for More Details

A. 18 days
B. 22 ½ days
C. 24 days
D. 26 days

If A completes a work in 1 day, B completes the same work in 3 days

Hence, if the difference is 2 days, B can complete the work in 3 days

=> if the difference is 60 days, B can complete the work in 90 days

=> Amount of work B can do in 1 day= 1/90

Amount of work A can do in 1 day = 3 × (1/90) = 1/30

Amount of work A and B can together do in 1 day = 1/90 + 1/30 = 4/90 = 2/45

=> A and B together can do the work in 45/2 days = 22 ½ days

Correct Answer: B. 22 ½ days


Click for More Details

A. 3 hrs.
B. 4 hrs,
C. 5 hrs.
D. 6 hrs.

X’s 1 hour work = 1/10
Y’s 1 hour work = 1/15
(x+y)’s 1 hour work = 1/10+1/15=5/30=1/6
Both the taps can fill the tank in 6 hrs.

Correct Answer: D. 6 hrs.


Click for More Details

A. 10 Rs,
B. 15 Rs,
C. 20 Rs.
D. 25 Rs.

B’s daily earning = Rs.(150-94)= Rs.56
A’s daily earning = Rs.(150-76)= Rs.74
C’s daily earning = Rs.[(150-(56+74)]=Rs.20

Correct Answer: C. 20 Rs.


Click for More Details

A. 12 days
B. 14 days
C. 16 days
D. 18 days

3 men does same work as 4 women in 43 days.

multiply 3 and 4 and 43 for a supposed amount of total work (516).

Now calculate how much work is done by 3 men in one day by dividing 516 by 43 (12). Then calculate one man work in one day by dividing 12 by 3 (4).

Same (12) amount of work is done by 4 women in one day. so one women does 12/4 (3) in one day.

now see there are 7 men and 5 women in the final team.
total amount of work in one day will be

7(4)+5(3) = 43

Now divide total work (516) by total work in one day (43) to get the answer (12)

Correct Answer: A. 12 days


Click for More Details

A. 1.8 days
B. 1.5 days
C. 1.2 days
D. 1 day

Time is
directly proportional to number of sofas
inversely proportional to number of people No. of days
= (6/8)*(8/10)*2
= 1.2 days

Correct Answer: C. 1.2 days


Click for More Details

A. 1
B. 5
C. 10
D. 25

10 workers make 10 tables in 10 days. 1 worker makes 1 table in 10 days. Similarly, 5 workers can make 5 tables in 10 days.

Correct Answer: C. 10


Click for More Details

A. 2 men
B. 12 men
C. 9 men
D. 18 men

For the work to be completed in 9 days,
6 men are required. Time and men are inversely proportional. For the work to be completed in 3 days,
6*9/3 = 18 men are required

Correct Answer: D. 18 men


Click for More Details

A. Rs.1104
B. Rs.1000
C. Rs.934
D. Rs.1210

Assume that cost of keeping a cow for 1 day = c ,

cost of keeping a goat for 1 day = g
Cost of keeping 20 cows and 40 goats for 10 days = 460

Cost of keeping 20 cows and 40 goats for 1 day = 460/10 = 46

=> 20c + 40g = 46

=> 10c + 20g = 23 —(1)

Given that 5g = c
Hence equation (1) can be written as 10c + 4c = 23 => 14c =23

=> c=23/14
cost of keeping 50 cows and 30 goats for 1 day

= 50c + 30g

= 50c + 6c (substituted 5g = c)

= 56 c = 56×23/14

= 92
Cost of keeping 50 cows and 30 goats for 12 days = 12×92 = 1104

Correct Answer: A. Rs.1104


Click for More Details

A. 7
B. 8
C. 9
D. 6
Let P takes x days to complete the work
Then Q takes x/2 days and R takes x/3 days to finish the work
Amount of work P does in 1 day = 1/x
Amount of work Q does in 1 day = 2/x
Amount of work R does in 1 day = 3/x
Amount of work P,Q and R do in 1 day = 1/x + 2/x + 3/x = 1/x (1 + 2 + 3) = 6/x
6/x = 2
=> x = 12
=> Q takes 12/2 days = 6 days to complete the work

Correct Answer: D. 6


Click for More Details

A. 50
B. 30
C. 40
D. 13

Work done by 4 men and 6 women in 1 day = 1/8
Work done by 3 men and 7 women in 1 day = 1/10
Let 1 man does m work in 1 day and 1 woman does w work in 1 day. The above equations can be written as
4m + 6w = 1/8 —(1)
3m + 7w = 1/10 —(2)
Solving equation (1) and (2) , we get m=11/400 and w=1/400
Amount of work 10 women can do in a day = 10 × (1/400) = 1/40
Ie, 10 women can complete the work in 40 days

Correct Answer: C. 40


Click for More Details

A. 10 days
B. 14 days
C. 15 days
D. 9 days

Correct Answer: C. 15 days


Click for More Details

A. 10 min
B. 20 min
C. 30 min
D. 40 min

Correct Answer: B. 20 min


Click for More Details

A. 15 days
B. 14 days
C. 16 days
D. 30 days

Raio of times taken by A and B = 1 : 3
If the difference of time is 2 days, B takes 3 days. If the difference of time is 10 days.
B takes [3/2×10]=15 days

Correct Answer: A. 15 days


Click for More Details

A. 6 days
B. 8 days
C. 10 days
D. 12 days

2 children = 1 man
(8 children + 12 men ) = 16 men
Now, less men, more days
12 : 16 : 9 : x
x = 16×9/12=12 days

Correct Answer: D. 12 days


Click for More Details

A. 48 days
B. 24 days
C. 40 days
D. 36 days

No. of days is
directly proportional to the length of the wall and
inversely proportional to the number of men No. of days = (1200/500)*(15/30)*30 = 36 days

Correct Answer: D. 36 days


Click for More Details

A. 24 days
B. 14 days
C. 15 days
D. 20 days

Time and Men are inversely proportional. Time taken by 28 men to finish the work = 15 days Time taken by a man to finish the work
= 15*28 days Time taken by 21 men = (15*28)/21 = 20 days

Correct Answer: D. 20 days


Click for More Details

A. 10 days
B. 12 days
C. 8 days
D. 9 days

Part of work completed by C in 1 day = 1/12 Part of work completed by D in 1 day = 1/15 Part of work completed by C in 4 days
= 1/3 Work remaining = 2/3 Time taken by D to complete the work
= (2/3)÷(1/15) = 10 days

Correct Answer: A. 10 days


Click for More Details

A. Rs.40
B. Rs.70
C. Rs.90
D. Rs.100

Amount Earned by P,Q and R in 1 day = 1620/9 = 180 —(1)
Amount Earned by P and R in 1 day = 600/5 = 120 —(2)
Amount Earned by Q and R in 1 day = 910/7 = 130 —(3)
(2)+(3)-(1) => Amount Earned by P , Q and 2R in 1 day
– Amount Earned by P,Q and R in 1 day = 120+130-180 = 70
=>Amount Earned by R in 1 day = 70

Correct Answer: B. Rs.70


Click for More Details

A. 5 days
B. 10 days
C. 15 days
D. 12 days

Work done by P in 1 day = 1/20
Work done by Q in 1 day = 1/12
Work done by P in 4 days = 4 × (1/20) = 1/5
Remaining work = 1 – 1/5 = 4/5
Work done by P and Q in 1 day = 1/20 + 1/12 = 8/60 = 2/15
Number of days P and Q take to complete the remaining work = (4/5) / (2/15) = 6
Total days = 4 + 6 = 10

Correct Answer: B. 10 days


Click for More Details

A. 8
B. 6
C. 4
D. 2

Work done by P in 1 day = 1/18
Work done by Q in 1 day = 1/15
Work done by Q in 10 days = 10/15 = 2/3
Remaining work = 1 – 2/3 = 1/3
Number of days in which P can finish the remaining work = (1/3) / (1/18) = 6

Correct Answer: B. 6


Click for More Details

A. 9(3/5) days
B. 9(1/5) days
C. 9(2/5) days
D. 10 days

Amount of work P can do in 1 day = 1/16
Amount of work Q can do in 1 day = 1/12
Amount of work P, Q and R can together do in 1 day = 1/4
Amount of work R can do in 1 day = 1/4 – (1/16 + 1/12) = 3/16 – 1/12 = 5/48
=> Hence R can do the job on 48/5 days = 9 (3/5) days

Correct Answer: A. 9(3/5) days


Click for More Details

A. 12 hrs
B. 14 hrs
C. 16 hrs
D. 18 hrs

Explanation:
Part filled in 10 hrs.
= 10[1/15+1/20−1/25]=23/30

Correct Answer: A. 12 hrs


Click for More Details

A. 12 days
B. 16 days
C. 18 days
D. 20 days

Correct Answer: B. 16 days


Click for More Details

A. 85 days
B. 126 days
C. 118 days
D. 136 days

Time taken is inversely proportional to their efficiency. So, time taken is in the ratio 8:5. Time taken by Rashid to finish the work = 8x Time taken by Danish to finish the work = 5x 8x-5x=51 3x=51 x=17 8x=136

Correct Answer: D. 136 days


Click for More Details

A. 16
B. 4
C. 12
D. 8

12 men work 8 hours for 10 days x men work 12 hours for 5 days x = (12*8*10)/(12*5) = 16 men

Correct Answer: A. 16


Click for More Details

A. 15
B. 14
C. 16
D. 13

Correct Answer: C. 16


Click for More Details

A. 7 hour 15 minutes
B. 7 hour 30 minutes
C. 8 hour 15 minutes
D. 8 hour 30 minutes

Pages typed by Mansoor-Ul-Haque in 1 hour = 32/6 = 16/3
Pages typed by Aaqib in 1 hour = 40/5 = 8
Pages typed by Mansoor-Ul-Haque and Aaqib in 1 hour = 16/3 + 8 = 40/3
Time taken to type 110 pages when Mansoor-Ul-Haque and Aaqib work together = 110 × 3 /40 = 33/4
= 8 ¼ hours = 8 hour 15 minutes

Correct Answer: C. 8 hour 15 minutes


Click for More Details

A. 3 pm
B. 2 pm
C. 1:00 pm
D. 11 am

Work done by P in 1 hour = 1/8
Work done by Q in 1 hour = 1/10
Work done by R in 1 hour = 1/12
Work done by P,Q and R in 1 hour = 1/8 + 1/10 + 1/12 = 37/120
Work done by Q and R in 1 hour = 1/10 + 1/12 = 22/120 = 11/60
From 9 am to 11 am, all the machines were operating.
Ie, they all operated for 2 hours and work completed = 2 × (37/120) = 37/60
Pending work = 1- 37/60 = 23/60
Hours taken by Q an R to complete the pending work = (23/60) / (11/60) = 23/11
which is approximately equal to 2
Hence the work will be completed approximately 2 hours after 11 am ; ie around 1 pm

Correct Answer: C. 1:00 pm


Click for More Details

A. 8/15
B. 7/15
C. 11/15
D. 2/11

Amount of work P can do in 1 day = 1/15
Amount of work Q can do in 1 day = 1/20
Amount of work P and Q can do in 1 day = 1/15 + 1/20 = 7/60
Amount of work P and Q can together do in 4 days = 4 × (7/60) = 7/15
Fraction of work left = 1 – 7/15= 8/15

Correct Answer: A. 8/15


Click for More Details

A. 30 min
B. 35 min
C. 40 min
D. 45 min

Correct Answer: D. 45 min


Click for More Details

A. 40 days
B. 50 days
C. 60 days
D. 70 days

(A+B)’S 1 day’s work = [1/15−1/20]=1/60
A alone can finish it in 60 days

Correct Answer: C. 60 days


Click for More Details

A. 50
B. 75
C. 60
D. 45

Part of work completed by Farjan and Kashif in a day
= 1/30 Part of work completed by them in 20 days
= 20/30 = 2/3 1/3 of the work is remaining. Kashif completes 1/3rd of the work in 25 days. Part of work completed by him in a day
= (1/3)÷25
= 1/75 (1/D)+(1/V) = 1/30 (1/D) = (1/30)-(1/75) = 1/50 Farjan can complete it in 50 days.

Correct Answer: A. 50


Click for More Details

A. 12:00 pm
B. 2:00 am
C. 12:00 am
D. 10:00 pm

Jameel works for 5 hours. So he completes 5/15 = 1/3 of the task Nasir has to complete 2/3rd of the task 12*2/3 = 8 hours are needed. He completes the task at 12:00 am.

Correct Answer: C. 12:00 am


Click for More Details

A. 10
B. 9
C. 11
D. 12

Work done by P in 1 day = 1/24
Work done by Q in 1 day = 1/9
Work done by R in 1 day = 1/12
Work done by Q and R in 1 day = 1/9 + 1/12 = 7/36
Work done by Q and R in 3 days = 3×7/36 = 7/12
Remaining work = 1 – 7/12 = 5/12
Number of days in which P can finish the remaining work = (5/12) / (1/24) = 10

Correct Answer: A. 10


Click for More Details

A. 14
B. 16
C. 15
D. 11

Work done by Kamal in 1 day = 1/20
Work done by Suresh in 1 day = (1/20) × (125/100) = 5/80 = 1/16
=> Suresh can complete the work in 16 days

Correct Answer: B. 16


Click for More Details

A. 37 ½ days
B. 22 days
C. 31 days
D. 22 days

Work done by A in 20 days = 80/100 = 8/10 = 4/5

Work done by A in 1 day = (4/5) / 20 = 4/100 = 1/25 — (1)

Work done by A and B in 3 days = 20/100 = 1/5 (Because remaining 20% is done in 3 days by A and B)

Work done by A and B in 1 day = 1/15 —(2)

Work done by B in 1 day = 1/15 – 1/25 = 2/75

=> B can complete the work in 75/2 days = 37 ½ days

Correct Answer: A. 37 ½ days


Click for More Details

A. 14
B. 15
C. 16
D. 18

Capacity of the tank = (12×13.5)=162 litres
Capacity of each bucket = 9 litres.
Number of buckets needed = 162/9=18

Correct Answer: D. 18


Click for More Details

A. 12,342 litres.
B. 12,444 litres
C. 12,566 litres.
D. None of thes

Correct Answer: A. 12,342 litres.


Click for More Details

A. 75/8 days
B. 44/6 days
C. 48/5 days
D. None of these

Correct Answer: A. 75/8 days


Click for More Details

A. 12
B. 8
C. 10
D. 9

Part of work completed by A in a day = 1/X Part of work completed by B in a day
= 1/(X+5) (1/X)+(1/(X+5)) = 1/6 (2X+5)/(X²+5X) = 1/6 X²+5X = 6(2X+5) X²-7X-30=0 Solving, X=10

Correct Answer: C. 10


Click for More Details

A. 2700
B. 1080
C. 450
D. 1800

Number of bottles produced by 1 machine in a minute
= 270/6 Number of bottles produced by 10 machines in 4 minutes
= (270/6)*10*4 = 1800

Correct Answer: D. 1800


Click for More Details

A. 7
B. 8
C. 9
D. 10

Let work done by P in 1 day = p
work done by Q in 1 day =q
Work done by R in 1 day = r
p + q = 1/8 —(1)
q + r= 1/12 —(2)
p+ q+ r = 1/6 —(3)
(3) – (2) => p = 1/6 – 1/12 = 1/12
(3) – (1) => r = 1/6 – 1/8 = 1/24
p + r = 1/12 + 1/24 = 3/24 = 1/8
=> P and R will finish the work in 8 days

Correct Answer: B. 8


Click for More Details

A. 7
B. 5
C. 6
D. 4

Work done by 10 men in 1 day = 1/7
Work done by 1 man in 1 day = (1/7)/10 = 1/70
Work done by 10 women in 1 day = 1/14
Work done by 1 woman in 1 day = 1/140
Work done by 5 men and 10 women in 1 day = 5 × (1/70) + 10 × (1/140)
= 5/70 + 10/140 = 1/7
=> 5 men and 10 women can complete the work in 7 days

Correct Answer: A. 7


Click for More Details

A. 30 days
B. 25 days
C. 20 days
D. 15 days

Work done by P and Q in 1 day = 1/10
Work done by R in 1 day = 1/50
Work done by P, Q and R in 1 day = 1/10 + 1/50 = 6/50
But Work done by P in 1 day = Work done by Q and R in 1 day . Hence the above equation can be written as
Work done by P in 1 day × 2 = 6/50
=> Work done by P in 1 day = 3/50
=> Work done by Q and R in 1 day = 3/50
Hence work done by Q in 1 day = 3/50 – 1/50 = 2/50 = 1/25
So Q alone can do the work in 25 days

Correct Answer: B. 25 days


Click for More Details

A. 5,750 litres
B. 5,760 litres
C. 6,890 litres
D. None of these

Correct Answer: B. 5,760 litres


Click for More Details

A. 12 min
B. 14 min
C. 16 min
D. 20 min

In this problem, rate of water pipe (waste) is more, the tank will be emptied when the pipes are opened.
Work done in total emptying in 1 min.
=1/16−1/32=1/32
Now, full tank will be emptied by them in 32 minutes.
Half full tank will be emptied in 16 minutes.

Correct Answer: C. 16 min


Click for More Details

A. 20 days
B. 30 days
C. 40 days
D. none of these

Correct Answer: B. 30 days


Click for More Details

A. 3:4
B. 5:4
C. 4:3
D. 5:3

Part of work completed by a man in a day = 1/(12*20)
= 1/240 Part of work completed by a woman in a day = 1/(20*16) = 1/320 Ratio of their capacities
= (1/240):(1/320) = 320:240 = 4:3

Correct Answer: C. 4:3


Click for More Details

A. 4
B. 9.6
C. 9
D. 10

Part of work completed by A and B in 4 days
= 4*((1/16) + (1/12))
= 7/12 C can complete 5/12th of the work in 4 days C can complete the whole job in
4÷(5/12) = 9.6 days

Correct Answer: B. 9.6


Click for More Details

A. 2
B. 8
C. 10
D. 12

M1*D1*W2 = M2*D2*W1
10*3*10*32 = 30*d*8*20
d = 2 days

Correct Answer: A. 2


Click for More Details

A. 1:3
B. 4:3
C. 2:3
D. 2:1

Work done by 20 women in 1 day = 1/16

Work done by 1 woman in 1 day = 1/(16×20)
Work done by 16 men in 1 day = 1/15

Work done by 1 man in 1 day = 1/(15×16)
Ratio of the capacity of a man and woman =1/(15×16) : 1/(16×20) = 1/15 : 1/20

= 1/3 :1/4 = 4:3

Correct Answer: B. 4:3


Click for More Details

A. 2
B. 3 3⁄7
C. 4 ¼
D. 5

Work done by P in 1 day = 1/24
Work done by Q in 1 day = 1/6
Work done by R in 1 day = 1/12
Work done by P,Q and R in 1 day = 1/24 + 1/6 + 1/12 = 7/24
=> Working together, they will complete the work in 24/7 days = 3 3⁄7 days

Correct Answer: B. 3 3⁄7


Click for More Details

A. 2 min
B. 3 min
C. 4 min
D. 5 min

Let Q be closed after x min.  Then part filled by (P+Q) in x min + part filled by P in ( 9 – x )min
x(1/12+1/16)+(9−x)1/12=1

Correct Answer: C. 4 min


Click for More Details

A. 12/6 days
B. 15/2 days
C. 23 days
D. 34 days

Ratio of time, taken by A and B = 160 : 100 = 8 : 5
If A takes 8 days, B takes 5 days.
If A takes 12 days, B takes = [5/8×12]=15/2 days

Correct Answer: B. 15/2 days


Click for More Details

A. 70 days
B. 120/7 days
C. 50 days
D. 45 days

Correct Answer: B. 120/7 days


Click for More Details

A. 5
B. 6
C. 7
D. 8

Part of work completed by A in a day = 1/21 Part of work completed by B in a day = 1/24 Part of work completed by them together in a day = (1/21)+(1/24)
= 5/56 Part of work completed by B in 9 days
= 9/24 = 3/8 If A left after x days,
(5x/56)+(3/8) = 1
x = 7

Correct Answer: C. 7


Click for More Details

A. 13
B. 11
C. 12
D. 15

A completes 2*(1/8) = 1/4th of the work 2/3rd of the remaining work
= (3/4) * (2/3) = 1/2 B completes 1/2 of the work in
(1/2)÷(1/14) = 7 days C completes 1/4th of the work in
(1/4)÷(1/16) = 4 days They take 13 days to complete the work

Correct Answer: A. 13


Click for More Details

A. 20
B. 25
C. 125
D. 60

M1*D1*W2 = M2*D2*W1
Where, M – number of people working
D – time of work
W – number of tasks or work
6*4*W2 = 10*6*50
W2 = 125 tasks

Correct Answer: C. 125


Click for More Details

A. 1
B. 2
C. 3
D. 4

Work done by Q in 1 day = 1/12
Work done by P in 1 day = 2 × (1/12) = 1/6
Work done by P and Q in 1 day = 1/12 + 1/6 = ¼
=> P and Q can finish the work in 4 days

Correct Answer: D. 4


Click for More Details

A. 9
B. 11
C. 23
D. 13

Work done by P in 1 day = 1/23
Let work done by Q in 1 day = q
q × (130/100) = 1/23
=> q = 100/(23×130) = 10/(23×13)
Work done by P and Q in 1 day = 1/23 + 10/(23×13) = 23/(23×13)= 1/13
=> P and Q together can do the work in 13 days

Correct Answer: D. 13


Click for More Details

A. 4 days
B. 6 days
C. 2 days
D. 8 days

Let work done by 1 man in 1 day = m and work done by 1 woman in 1 day = b
Work done by 6 men and 8 women in 1 day = 1/10
=> 6m + 8b = 1/10
=> 60m + 80b = 1 — (1)
Work done by 26 men and 48 women in 1 day = 1/2
=> 26m + 48b = ½
=> 52m + 96b = 1— (2)
Solving equation 1 and equation 2. We get m = 1/100 and b = 1/200
Work done by 15 men and 20 women in 1 day
= 15/100 + 20/200 =1/4
=> Time taken by 15 men and 20 women in doing the work = 4 days

Correct Answer: A. 4 days


Click for More Details

A. 10 min
B. 20 min
C. 30 min
D. 40 min

Work done by waste pipe in 1 minute
=1/20−(1/12+1/15)=−1/10
Waste pipe will empty the full cistern in 10 minutes.

Correct Answer: A. 10 min


Click for More Details

A. 5 min
B. 10 min
C. 15 min
D. 20 min

Correct Answer: A. 5 min


Click for More Details

A. 35 Rs.
B. 40 Rs.
C. 45 Rs.
D. None of these

Ratio of time taken by A and B= 10 : 15 = 2 : 3
Ratio of work done in the same time  = 3:2, So, the money is to be divided among A and B in the ratio 3 : 2
A’s share = Rs. [75×3/5] = Rs.45.

Correct Answer: C. 45 Rs.


Click for More Details

A. 30 days
B. 25 days
C. 24 days
D. 20 days

Part of work done by 1 man in a day = 1/m Part of work done by 1 woman in a day
= 1/w (2/m)+(12/w) = (1/4) (4/m)+(6/w) = (1/5) Solving,
1/m = 1/40 ,1/w = 1/60 (1/m)+(1/w) = 5/120 = 1/24

Correct Answer: C. 24 days


Click for More Details

A. 3/5
B. 4/7
C. 2/5
D. 1/4

Part of work completed by Bilal in a day = 1/15 Part of work completed by Jalal in a day = 1/12 Part of work completed by them in a day = (1/15)+(1/12) = 3/20 Part of work completed by them in 4 days = (3/20)*4 = 3/5 Fraction of work left
= 1-(3/5)
= 2/5

Correct Answer: C. 2/5


Click for More Details

A. 48
B. 34(2/7)
C. 44
D. 45

(1/A)+(1/B) = (1/20) (1/B)+(1/C) = (1/30) (1/A)+(1/C) = (1/40) Solving the three equations,
A=48

Correct Answer: A. 48


Click for More Details

A. 120, 40, 60 days
B. 120, 60, 80 days
C. 40, 30, 120 days
D. 30, 40, 60 days

Let a: be the time in which X & Y completes their work = 30 days
b: time in which Y & Z completes their work = 24 days
c: time in which X & Z completes their work = 40 days
X alone can complete the work in (2 * a * c) / (ab + bc – ac) days
= 2 * 30 * 24 * 40 / ((30 * 24) + (24 * 40) – (30 * 40)) = 120 days
Y alone can complete the work in 2 * a * b * c / (- ab + bc + ac) days
= 2 * 30 * 24 * 40 / (-(30 * 24) + (24 * 40) + (30 * 40)) = 40 days
Z alone can complete the work in 2 * a * b * c / (ab – bc + ac) days
= 2 * 30 * 24 * 40 / ((30 * 24) – (24 * 40) + (30 * 40))
= 60 days

Correct Answer: A. 120, 40, 60 days


Click for More Details

A. 10
B. 8
C. 18
D. 19

Let work done by P in 1 day = p,
Work done by Q in 1 day = q,
Work done by R in 1 day = r
p + q = 1/30
q + r = 1/24
r + p = 1/20
Adding all the above, 2p + 2q + 2r = 1/30 + 1/24+ 1/20 = 15/120 = 1/8
=> p + q + r = 1/16
=> Work done by P,Q and R in 1 day = 1/16
Work done by P, Q and R in 10 days = 10 × (1/16) = 10/16 = 5/8
Remaining work = 1 = 5/8 = 3/8
Work done by P in 1 day = Work done by P,Q and R in 1 day – Work done by Q and R in 1 day
= 1/16 – 1/24 = 1/48
Number of days P needs to work to complete the remaining work = (3/8) / (1/48) = 18

Correct Answer: C. 18


Click for More Details

A. 5 5⁄11
B. 4 5⁄11
C. 6 4⁄11
D. 6 5⁄11

A can complete the work in 12 days working 8 hours a day
=> Number of hours A can complete the work = 12×8 = 96 hours
=> Work done by A in 1 hour = 1/96
B can complete the work in 8 days working 10 hours a day
=> Number of hours B can complete the work = 8×10 = 80 hours
=> Work done by B in 1 hour = 1/80
Work done by A and B in 1 hour = 1/96 + 1/80 = 11/480
=> A and B can complete the work in 480/11 hours
A and B works 8 hours a day
Hence total days to complete the work with A and B working together
= (480/11)/ (8) = 60/11 days = 5 5⁄11 days

Correct Answer: A. 5 5⁄11


Click for More Details

A. Rs. 380
B. Rs. 600
C. Rs. 420
D. Rs. 400

Amount of work A can do in 1 day = 1/6
Amount of work B can do in 1 day = 1/8
Amount of work A + B can do in 1 day = 1/6 + 1/8 = 7/24
Amount of work A + B + C can do = 1/3
Amount of work C can do in 1 day = 1/3 – 7/24 = 1/24
work A can do in 1 day: work B can do in 1 day: work C can do in 1 day
= 1/6 : 1/8 : 1/24 = 4 : 3 : 1
Amount to be paid to C = 3200 × (1/8) = 400

Correct Answer: D. Rs. 400


Click for More Details

A. 5 hrs
B. 10 hrs
C. 15 hrs
D. 20 hrs

Correct Answer: C. 15 hrs


Click for More Details

A. 7.5 hrs
B. 5 hrs
C. 7 hrs
D. None of these

Correct Answer: A. 7.5 hrs


Click for More Details

A. 42/4 days
B. 41/4 days
C. 55 days
D. None of these

Correct Answer: B. 41/4 days


Click for More Details

A. 15 days
B. 10 days
C. 8 days
D. 20 days

(4/m)+(2/w) = 1/2 2/m = 1/5 1/m = 1/10 (4/10)+(2/w) = (1/2) 2/w = 1/10 2 women alone take 10 days.

Correct Answer: B. 10 days


Click for More Details

A. 32 hours
B. 48 hours
C. 3 days
D. 4 days

Part of task completed by A in a day = 1/x Part of task completed by B in a day = 3/x (B is thrice as efficient as A) (1/x)+(3/x) = 1 4/x = 1 x = 4 B completes 3/4th of the task in a day. He takes 4/3 days to complete the entire task. 4/3 days = (4/3*24) hours = 32 hours

Correct Answer: A. 32 hours


Click for More Details

A. 4(2/3) days
B. 4 days
C. 5(1/3) days
D. 1(1/3) days

(1/A)+(1/B) = (1/6) (1/B)+(1/C) = (1/12) (1/A)+(1/C) = (1/8) Solving the three equations,
(1/A)+(1/B)+(1/C) = (3/16) Together they take 16/3 = 5(1/3) days to complete the task.

Correct Answer: C. 5(1/3) days


Click for More Details

A. 12 days
B. 15 days
C. 16 days
D. 18 days

Correct Answer: C. 16 days


Click for More Details

A. 10 days
B. 11 days
C. 15 days
D. 20 days

Correct Answer: C. 15 days


Click for More Details