Home
About Us
Contact Us
Privacy Policy
Search
Home
→
Water Management
→
A series of vertical steps in a stream made to avoid soil scouring is called ___________________?
Related MCQs
The ratio between the force causing a body to slide along a plane and the force normal to the plane is called __________?
The science of water which deals with the depletion and replenishment of water resources is called__________?
The maximum rate at which the soil in given condition can absorb water is called __________?
The field capacity is the amount of water retained by a saturated soil mass after being acted by gravity. The amount of water required to bring the soil moisture content of that soil up to field capacity is called__________?
In the initial stage of rainfall, when soil moisture available in the root zone is very low, the rate of infiltration ?
To be more close to the actual field conditions, some times artificial rain tests conducted, the instrument used is called __________?
During the peak stage of river, there exist an out flow from river into the ground water reservoir, in such case river will be called __________?
The water evaporates from paddy surfaces to the atmosphere in the form of water vapours, these water vapours get collected in the atmosphere and behave & like__________?
When the air in a atmosphere is fully saturated with the vapours present in it, then the pressure exerted by such wet air mass will be called __________?
The amount of moisture content present in the air, when it is expressed as weight per unit volume is called __________?
A cloud is formed due to condensation. it consists of a small particle of ice an. small droplets of water, having diameter about __________microns?
The percentage of culturable commended area, irrigated during the year to the total culturable commanded area on a outlet or channel is called__________?
Hydraulic structures are designed for a safe flow of flood. The floods which are equal in designed magnitude life of the project is called __________?
A particular flood which can occur in the basin in the worst meteorological and hydrological conditions is called __________?
If a river or stream is collecting sediment and is building up dunes in its bed is called __________?
A river before its joins the sea, gets divided into small channels, thus forming a Triangular shape called __________?
In a river the flood water dries up before it joins the sea or any other river, such river is called __________?
when ever a sloping face of river bank is protected by stone pitching against scour, the pitching is extended beyond the toe to the river side that is called__________?
The groyne pointing upwards direction of flow is called __________?
If the weir flood is designed continuous with divide piers as reinforced structure,such that the weight of divide piers, keep the structure safe against uplift, is called__________?
The rise in river water level at up stream due to construction of weir is called__________?
Silt free water should be supplied to the canals through__________?
The wall of masonry or concrete, constructed at 90° to the axis of weir to separate normal weir from under sluices is called__________?
A fish ladder is device by which flow energy can be dissipated in such a manner as to provide easy access to the downstream fish to come on upstream side, the velocity of flow varies from__________?
In high floods, to avoid spilling of flood water over the gates, a wall is provided from pond level to high Flood level. This wall spans for the entire length of regulator, rest on piers, sustain water pressure by its weight called__________?
The structures, which are constructed on the river bed upstream of head regulator. With this clear water enters in canal such structures are called__________?
The depth before the jump is always less then the depth after the jump. The depth before the jump is called initial depth and depth after the jump is called__________?
Mostly the hydraulic structures founded on __________ soils fails because of undermining and uplift pressure?
At the end of hydraulic structure, the upward force of sub-soil water just becomes equal to the submerged weight of soil grains Then exit gradient will be called__________?
Now- a -days the hydraulic structures are designed. Keeping in view the flow net, this was given by __________?
To avoid scouring from end of structure, it is necessary to provide a __________ at the exit point?
For strong Hydraulic jump containing maximum energy, the down stream glacis should be sloped at a slope of __________ to dissipate max: energy?
When a weir is constructed, the downstream .bed of the river goes on eroding and consequently causes progressive lowering of the bed on downstream of weir called__________?
The water way from a weir is determined by using Lacey’s wetted perimeter i.e. P=_______(Q)1/2 ?
A water pool is designed on the down stream of the hydraulic structure to dissipate the energy of falling water by providing a water cushion called __________?
A module or outlet in which discharge depends upon the difference of head between distributary and the water course is called __________?
An outlet through which the discharge depends upon the water level in the distributary is called __________?
The ratio of the rate of change of discharge through out let to the rate of c./v of water level of the distributary is called__________?
When FSL of the canal is sufficiently below the bottom of the drain, so that water flows freely under gravity, such structures is called__________?
A structure provided when a large canal a big drainage channel approach other practically at the same level is called__________?
An open cut in the canal bank. with bed and sides to escape canal water through a lead channel to mix water in a nearby drain is called __________?
The total dissolved solids in drinking water should not exceed__________?
On relative basis, when one soil is eroded as compared to other soil under same conditions, this property is called __________?
Darcy formula for loss of head in pipes is given by, hf=4fl v2 / __________?
The aeration of water is done to remove __________?
Velocity of flow in a sewer must be form __________ to ?
A digging out of earth to make trench for any engineering purpose is called __________?
The water in swimming pools can be __________ by using any one from the following, chlorine-ultraviolet rays and bromine t ?
Mostly the salt of calcium and Magnesium can not cause __________?
An open cut given in a canal bank, suitably protected by stone pitching to the upland drainage water into the canal is called __________?
When FSL of the canal is sufficiently above the bed level of drainage so that canal flows under syphonis action, the structure is called __________?
A series of vertical steps in a stream made to avoid soil scouring is called ___________________?
A. Levees
B. Embankment
C. Cascades
D. Banks
Correct Answer:
Cascades
✔