Home
About Us
Contact Us
Privacy Policy
Search
Home
→
Forestry Mcqs
→
Watershed and Range Management
→
At present ______ population is living in the watershed areas and are converting forest into agriculture land for food production:
Related MCQs
It is estimated that ______ square km land has been converted to unproductive deserts in the last 50 years:
In Pakistan about ________ area is arid or semi arid and agriculture is not possible without irrigation:
The importance of watershed management was realized when Pakistan signed Indus Water Treaty with India through which right of water of ______ was given to India while Pakistan has the right on river Indus and Jhelum:
Mangla dam on river:
Tarbela dam on river:
Tarbela dam is being silted at _____ acre feet per year while Mangla is being silted at a rate of _____ acre feet per year due to misuse of their watershed area:
Main source of energy in Pakistan is:
Government of Pakistan has realized the importance of watershed management and an extensive watershed development programme is being implemented in:
Special courses have been introduced at:
Watershed regions of Pakistan is/are:
Main watershed regions and their problems are:
The northern mountain region problems is / are:
The uplands of northern Punjab problems is / are:
The western mountain region problem is / are:
The coastal belt problems is / are:
The Indus plain problems is / are:
The socioeconomic condition of the people in watersheds areas are:
Efforts made to improve the watersheds in Pakistan is /are:
The projects are being implemented either through the country’s own resources or with the help of donor agencies such as:
Alternative strategies and approaches is / are:
Creation of Public awareness of the problem is / are:
The use of incentives approaches is / are:
Introduction of small-scale rural uplift schemes approaches is / are:
Training and education approaches is / are:
Transfer of information and technology approaches is / are:
Watershed planning approaches is / are:
Need for planning objectives is / are:
Management constraints – the constraints of management need to be identified in the initial phase of planning:
The major factors related to organizational structure are:
Watershed management planning phases is / are:
The inventory should include the collection of data requirements are:
Selection of the “best” alternative should be based on several factors:
Watershed works plan – A detailed plan of operation should be developed which permits a timely, appropriately funded (quarterly, annually, etc.) operation of the plan. The plan should include details of:
Range improvement techniques are:
Range reseeding is:
Stock water development is:
How plants tolerate grazing are:
What are the principles of range management?
Range suitability is the adoptability of range area to grazing by livestock. Factor to be considered for it:
Frazing systems are:
Grazing systems in the northern mountains are:
Grazing systems in Balochistan and Sulaiman mountain range are:
Range land rehabilitation policies and measures are:
Range management includes:
Pakistan has a total livestock population of about 100 million heads, composed primarily of ______:
About _______ people in this country living from Himalayas to the coast of Arabian sea depend on livestock for their bread and butter and are engaged in its herding and rearing:
A country where _____ per cent of the total aea consists of moutains, gullied foot hills, arid waste and deserts, can never achieve the desired progress unless major part of this usable waste is harnessed to the advantage of its people:
Range resources of Pakistan is/are:
About ______ percent of the country is arid to semi-arid:
The areas laying above an altitude of about ______ and below zone of perpetual snow constitute alpine pastures:
Major types of Alpine vegetation is classified into the:
At present ______ population is living in the watershed areas and are converting forest into agriculture land for food production:
A. 50-80%
B. 55-85%
C. 60-90%
D. 65-95%
Correct Answer:
50-80%
✔
Last Updated:
May 24, 2024