In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches__________________?
Related MCQs
The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as__________?
Work study is concerned with__________?
What does symbol ‘O’ imply in work study__________?
What does symbol ‘V’ employ in work study__________?
String diagram is used when__________?
Micromotion study is__________?
The allowed time for a job equals standard time plus__________?
The standard time for a job is__________?
Scheduling gives information about__________?
Choose the wrong statement Time study is used to__________?
Micro motion study is__________?
TMU in method time measurement stands for__________?
Work sampling observations are taken on the basis of__________?
Basic motion time study gives times for basic motions in ten thousandths of__________?
Gnatt chart provides information about the__________?
Process layout is employed for__________?
Travel charts provide__________?
The most important objective behind plant layout is__________?
A low unit cost can be obtained by following__________?
The main disadvantage of line organisation is__________?
Frederick W. Taylor introduced a system of working known as__________?
The most popular type of organisation used for Civil Engineering Constructions is__________?
In steel plant the most important system for materials handling is__________?
Queuing theory deals with problems of__________?
Father of industrial engineering is__________?
Which of the following organisation is preferred in automobile industry__________?
The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store__________?
Gnatt charts are used for__________?
Gnatt charts provide information about__________?
In inventory control, the economic order quantity is the__________?
The appellate authority for an industrial dispute is__________?
Standing orders which are statutory are applicable to__________?
The technique of value analysis can be applied to__________?
Value engineering aims at finding out the__________?
According to MAPI formula, the old machine should be replaced by new one when__________?
Material handling and plant location is analysed by__________?
Motion study involves analysis of__________?
Pick up the incorrect statement about advantages of work sampling__________?
Which of the following layouts is suited for mass production__________?
The employees provident fund act is applicable to__________?
The deductions for, employees provident fund start__________?
Tick the odd man out__________?
The objective of time study is to determine the time required to complete a job by__________?
CPM has following time estimate__________
For ship vessel industry the following layout is best suited__________?
Routing is essential in the following type of industry__________?
Graphical method, simplex method, and transportation method are concerned with__________?
In the Halsey 50-50 plan, the following are rewarded more__________?
‘Value’ for value engineering and analysis purposes is defined as__________?
In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic __________?
Which of the following plans motivates supervisors by paying a premium on time saved by workers__________?
In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches__________________?
A. 50%
B. 661%
C. 75%
D. 80%
E. 90%
Correct Answer:
661%
✔