A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above
Correct Answer: all of the above ✔
Last Updated: January 28, 2019
A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above
Correct Answer: all of the above ✔
Last Updated: January 28, 2019