Option A: (i) and (ii) are correct
Option B: (ii) and (iii) are correct
Option C: (i) and (iii) are correct
Option D: (i), (ii) and (iii) are correct
Correct Answer: (ii) and (iii) are correct ✔
Click for More Details
Option A: 0.6 Hs and 1.67 Hs
Option B: 0.6 Hs and 1.87 Hs
Option C: 1.27 Hs and 1.87 Hs
Option D: 1.27 Hs and 1.67 Hs
Correct Answer: 0.6 Hs and 1.87 Hs ✔
Click for More Details
Option A: Both A and R are true and R is the correct explanation of A.
Option B: Both A and R are true but R is not correct explanation of A.
Option C: A is true but R is false.
Option D: A is false but R is true.
Correct Answer: Both A and R are true and R is the correct explanation of A. ✔
Click for More Details
Option A: (i) and (ii) are correct
Option B: (ii) and (iii) are correct
Option C: (i) and (iii) are correct
Option D: (i), (ii) and (iii) are correct
Correct Answer: (ii) and (iii) are correct ✔
Click for More Details
Option A: i) and ii) are correct
Option B: ii) and iii) are correct
Option C: i) and iii) are correct
Option D: Only iii) is correct
Correct Answer: i) and iii) are correct ✔
Click for More Details
Option A: (i) and (ii) are correct
Option B: (i) and (iii) are correct
Option C: (ii) and (iv) are correct
Option D: (iii) and (iv) are correct
Correct Answer: (iii) and (iv) are correct ✔
Click for More Details
Option A: Both A and R are true and R is the correct explanation of A.
Option B: Both A and R are true but R is not the correct explanation of A.
Option C: A is true but R is false.
Option D: A is false but R is true.
Correct Answer: Both A and R are true and R is the correct explanation of A. ✔
Click for More Details
Option A: the length of design vessel
Option B: the length of design vessel + 10% clearance between adjacent vessels
Option C: the length of design vessel + 20% clearance between adjacent vessels
Option D: twice the length of design vessel
Correct Answer: the length of design vessel ✔
Click for More Details
Option A: 1.3412
Option B: 1.5612
Option C: 1.7412
Option D: 1.9412
Correct Answer: 1.5612 ✔
Click for More Details
Option A: Manoeuvring lane + 2 x Bank clearance lane
Option B: 2 x Manoeuvring lane + 2 x Bank clearance lane
Option C: 2 x Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane
Option D: Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane
Correct Answer: Manoeuvring lane + 2 x Bank clearance lane ✔
Click for More Details
Option A: The progress of work in low level method of mound construction is very slow.
Option B: Barge method of mound construction is economical.
Option C: In low level method of mound construction, the area of working is limited.
Option D: In staging method of mound cons-truction, the work is not interrupted even during stormy weather
Correct Answer: Barge method of mound construction is economical. ✔
Click for More Details
Option A: mean range
Option B: maximum range
Option C: maximum rise
Option D: mean rise
Correct Answer: maximum range ✔
Click for More Details
Option A: 1.2 H to 1.25 H above the datum
Option B: 1.2 H to 1.25 H above the low water level
Option C: 1.2 H to 1.25 H above the high water level
Option D: 1.2 H to 1.25 H above the mean sea level
Correct Answer: 1.2 H to 1.25 H above the high water level ✔
Click for More Details
Option A: (i) and (ii) are correct
Option B: (i) and (iii) are correct
Option C: Only (ii) is correct
Option D: Only (iii) is correct
Correct Answer: (i) and (ii) are correct ✔
Click for More Details
Option A: one – third highest waves
Option B: one – fourth highest waves
Option C: one – fifth highest waves
Option D: one – tenth highest waves
Correct Answer: one – third highest waves ✔
Click for More Details
Option A: Surf
Option B: Clapotis
Option C: Fetch
Option D: Swell
Correct Answer: Clapotis ✔
Click for More Details
Option A: vertical sea wall
Option B: sea wall with batter
Option C: stepped sea wall
Option D: sea wall with concave face
Correct Answer: sea wall with concave face ✔
Click for More Details
Option A: marine railways, dry docks, floating docks, wet docks
Option B: dry docks, wet docks, floating docks, lift docks
Option C: wet docks, floating docks, lift docks, marine railways
Option D: wet docks, lift docks, marine railways, dry docks
Correct Answer: wet docks, floating docks, lift docks, marine railways ✔
Click for More Details
Option A: when the dock is empty
Option B: when the dock is empty with the ship of maximum tonnage
Option C: when the dock is full of water
Option D: when the dock is dry and is under construction
Correct Answer: when the dock is full of water ✔
Click for More Details
Option A: 90° with the face of the dock
Option B: 45° with the face of the dock
Option C: 30° with the face of the dock
Option D: 10° with the face of the dock
Correct Answer: 10° with the face of the dock ✔
Click for More Details
Option A: Dry dock
Option B: Wet dock
Option C: Floating dock
Option D: Refuge dock
Correct Answer: Floating dock ✔
Click for More Details
For designing the dock, the proportion of ship load assumed to be borne by keel blocks is__________?
Option A: 5/8
Option B: 3/8
Option C: 3/16
Option D: 5/16
Correct Answer: 5/8 ✔
Click for More Details
Option A: groynes
Option B: sea walls
Option C: revetments
Option D: moles
Correct Answer: groynes ✔
Click for More Details
Option A: Both A and R are true and R is the correct explanation of A
Option B: Both A and R are true but R is not a correct explanation of A
Option C: A is true but R is false
Option D: A is false but R is true
Correct Answer: Both A and R are true and R is the correct explanation of A ✔
Click for More Details
Option A: sea walls, bulk heads and groynes
Option B: sea walls, bulk heads and revetments
Option C: sea walls, revetments and groynes
Option D: bulk heads, revetments and groynes
Correct Answer: sea walls, bulk heads and revetments ✔
Click for More Details
Option A: bollard
Option B: buoys
Option C: cables
Option D: anchors
Correct Answer: bollard ✔
Click for More Details
Option A: two points
Option B: four points
Option C: six points
Option D: eight points
Correct Answer: four points ✔
Click for More Details
Option A: 2.5 m
Option B: 4 m
Option C: 5 m
Option D: 7 m
Correct Answer: 7 m ✔
Click for More Details
Option A: requires skilled labour
Option B: requires low maintenance cost
Option C: requires less material
Option D: results in less damage due to gradual failure
Correct Answer: results in less damage due to gradual failure ✔
Click for More Details
Option A: B or 30 m
Option B: 1.5 B or 50 m
Option C: 1.5 B
Option D: 50 m
Correct Answer: B or 30 m ✔
Click for More Details
Option A: 2.073 m
Option B: 8.169 m
Option C: 9.144 m
Option D: 6.8 m
Correct Answer: 9.144 m ✔
Click for More Details
Option A: Both A and R are true and R is correct explanation of A.
Option B: Both A and R are true but R is not the correct explanation of A.
Option C: A is true but R is false.
Option D: A is false but R is true
Correct Answer: Both A and R are true and R is correct explanation of A. ✔
Click for More Details
Option A: 0.34 VF
Option B: 0.5 VF
Option C: 1.5 VF
Option D: 3.4 VF
Correct Answer: 0.34 VF ✔
Click for More Details
Option A: L
Option B: 1.5 L
Option C: 2.0 L
Option D: 4.0 L
Correct Answer: L ✔
Click for More Details
Option A: beam
Option B: depth
Option C: freeboard
Option D: draft
Correct Answer: draft ✔
Click for More Details